| 2 July | The van leaves Oxford and breaks down! | ||
| 5-6 July | "Top Camp" established at the Snow Pole | ||
| 6 July | F65 | Located and bottomed | JH CJD |
| F41 | Snow digging trip | TSG AB PM | |
| 7 July | F64 | Pushed down the first 2 pitches | CJD AB |
| Area F | F66, F67 and F68 located | TSG PM | |
| Area F | F70 and F69 located | PMM MN | |
| F64 | Surveyed then pushed They Come at Night | TSG JPNP JH | |
| 8 July | F64 | Surveyed and pushed Mostly | PMM RG |
| Area F | F68 digging rocks, F41 digging snow | MN RB PM AH WN | |
| Area F | F70 explored | JH JPNP | |
| 9 July | F64 | The Fierce Ladies of Cannock reached | TSG PM JH JPNP |
| Area F | F70 pushed, F41 snow digging | WN RG MN RB | |
| 10 July | F64 | hammering The Fierce Ladies | GL AH JH |
| F64 | Survey trip | MN JH JPNP | |
| Area F | Shaft bashing | RB | |
| Area C | C6, 7 & 8 examined | WN WS | |
| 11 July | Area F | F56 re-examined | GL JH |
| Area F | F80 and F81 found | PMM | |
| F64 | Fierce Ladies and first of Their Sisters passed | TSG CJD | |
| F64 | Various leads looked into | RG AB | |
| 12 July | C8 | Collapsed boulder choke | PM WS |
| F64 | Surveying and second sister pushed | CJD AH TSG | |
| Shaft bashing | RB RG | ||
| F64 | Pushing up inlet | SJP MN | |
| 13 July | C8 | Through the Square Window | WS PM |
| C8 | In The Wiggly Bit and the Arched Window | WN RG | |
| C8 | The Round Window | TSG AB | |
| F64 | Climbing above They Come at Night | RB CJD | |
| Area F | F71 and F72 examined | PMM SJP | |
| 14 July | Area F | F80 and F81 located, F81 bottomed | WS PMM AB SJP |
| F64 | Bad Habits surmounted | GL JH | |
| C8 | Surveying trip | CJD RB JPNP | |
| F71 | More work on the squeezes | TSG SJP | |
| C8 | Smarty Run examined | WN KT JB | |
| 15 July | F64 | Old Bore's Hill climbed, choke examined | TSG GL |
| C8 | Window cleaning | PM JPNP KT | |
| F71 | Hammering squeeze | RB SJP | |
| Area F | Shaft bashing | SC JB | |
| F64 | Trying The Ladies | CV JH MN | |
| 16 July | F64 | Survey trip | GL JH KT |
| F71 | Passed squeeze (again) | SJP JB MN | |
| Area F | F82 located | SC | |
| 17 July | F64 | Surveying trip | UM ADS JH |
| C8 | Trip abandoned due to chopped rope | MN AH SJP RG | |
| F71 | Squeeze passed (yet again) | MN RB SJP JPNP | |
| 18 July | F64 | An attempt to pass the boulder choke | ADS JPNP KT |
| C8 | C9 "found" (C3 rediscovered) | WS PM JH | |
| F71 | Cave bottomed | JB SJP | |
| F80 | Quickly ran out of rope | RB PMM RG | |
| 19 July | C3 | Explored to boulder choke | WS PM JH |
| Areas C, 9, 6 | Shaft bashing | GL | |
| F64 | Boulder choke attacked | ADS | |
| Area F | F75-78 located | JAR RB SV | |
| 20 July | C3 | Entrance rerigged, Anethical descended | PM WS RG |
| C3 | Tourist trip | JB UM KT | |
| F64 | Tourist trip | SV ADS | |
| 21 July | C3 | Good Night Vienna and Bullseye examined | WS PM RG |
| F64 | Boulder choke finally solved | ADS | |
| F71 | Detackling and photo trip | PMM CV JB KT | |
| F64 | Quicky trip | KT JB | |
| C3 | Survey trip | UM AH MN | |
| 22 July | C3 | Moose Hole to 65p Streamway explored | WS PM RG |
| C3 | Surveying | AH JH MN | |
| F64 | Pushing the rift beyond Tony's pitch | GL DL | |
| C3 | Rerigging | PMM JPNP | |
| C3 | Snickers descended (Snab in the Dark) | UM ADS HS | |
| 23 July | C3 | Descended the Wet Pitch (She Rises) | WS JH |
| C3 | Survey trip | DL CV KT JB | |
| F64 | Survey trip | JH MN SJP | |
| 23-24 July | C3 | Night Games | WS PMM JH |
| 24 July | F64 | Further down into Zodiac Rift | GL JPNP RG |
| C3 | Survey team | MN SJP HS | |
| C3 | Pushed through Tony's wet crawl | ADS KT | |
| 25 July | F64 | Checked out loose ends and tided up a bit | GL MN |
| C3 | Surveying | AH UM DL | |
| 26 July | F52 | Small extension | GL |
| C3 | Rerigging and surveying | WS JH PMM | |
| Area F | F75-78 all bottomed | JAR SV | |
| F79 | Bottomed | KT JB | |
| 27 July | C3 | Jolly trip | JH SV |
| Area G | Photo trip | JAR | |
| C3 | Wet Crawl bypassed, pitch beyond examined | ADS DL KT | |
| 28 July | F80 | Surveyed, photographed and derigged | PMM SJP |
| 29 July | C3 | "100 m" pitch traversed over | WS JH |
| F80 | Gear recovered | PMM | |
| F64 | Further work in Zodiac Rift | GL JH AH HS | |
| F64 | Inlet climbed | RG SJP | |
| 30 July | C3 | Photo trip | PMM SJP |
| 31 July | F64 | Further down the rift | GL JPNP |
| C3 | A jolly | DL MN | |
| Area C | C 10-12 located | WS | |
| Area F | F48 re-examined | AH HS | |
| Area F | Prospecting | SC | |
| 1 August | Cavers' Holiday | ||
| 2 Aug | C3 | Survey trip | MN HS JPNP |
| C3 | Meat Cleaver and Defenestrator examined | WS DL JH | |
| C10 | Bottomed | AH SJP GL | |
| 3 Aug | Area F | F70 and 72 re-examined | GL SJP SC |
| 4 Aug | F64 | Deeper in Zodiac Rift | GL AH |
| F64 | Photography trip | JH SJP | |
| Area C | Surface survey | MH WS | |
| 5 Aug | C12 | Cave bottomed | JPNP AH SJP |
| C3 | The Klingon reached | WS JH | |
| 6 Aug | Area F | F24 and 27 re-examined and 83 bottomed | GL SC |
| C3 | Photo trip | JH PG SJP | |
| C11 | Cave examined and dug a little | AH MN DL HS | |
| 7 Aug | F64 | Deeper still in Zodiac Rift | GL JPNP |
| F64 | Tourist trip | MN PG | |
| C11 | Little progress made before the site was abandoned | AH SJP | |
| 8 Aug | Area C | Shaft bashing | IA GN |
| 9 Aug | C3 | Final pushing trip potential campsite found | WS AH JH |
| F64 | Bottom of rift reached | WS JPNP | |
| 10 Aug | C3 | Photo trip | PG SJP (AA) |
| Area C | C13 and 14 located | IA GN | |
| 11 Aug | F64 | Derigged | JH GL JP SGR |
| C3 | Derigging | DL HS WS MN | |
| C13 | Going down, ran out of time, derigged | IA GN | |
| 13 Aug | C3 | Derigging | SGR PG JH AH |
| 14 Aug | C3 | Derigging | JH DL HS GN IA JPNP |
| 15 Aug | C41 | Snow plug re-examined | GL |
| 15-18 Aug | Top Camp dismantled, carried down the hill | ||
| 19 Aug | Beach Party | ||
| 22 Aug | The red van returns to Oxford | ||